Brightline West

Connecting Las Vegas to Southern California
Project Overview

218 miles

The distance from Las Vegas to Rancho Cucamonga

200 mph

Top operating speed.

20 million

Population served (includes Greater L.A., Inland Empire and Clark County, NV)

Las Vegas is one of the world's leading tourist destinations, stimulating about 50 million annual trips between Los Angeles and Las Vegas and more than 85% of them by car. The 218-mile, all-electric Brightline West system will provide a fast, zero-emission alternative to the extremely congested I-5 corridor connecting Las Vegas and Southern California.

The high-speed train will reach speeds of 200 mph and complete the one-way trip in 2 hours and 10 minutes, compared to over 4 hours by car.

Once operational, Brightline West will replace millions of car trips and reduce carbon emissions by more than 325,000 tons annually.

Viva Las Vegas

Brightline West promises to transform the Las Vegas travel experience for millions of visitors every year.
see official project site

Frequently Asked Questions

Construction has begun and environmental approvals are complete for all major segments. Final design is underway for the High Desert Corridor between Apple Valley and Rancho Cucamonga.

The project faces a funding gap due to rising construction and material costs and has applied for a $6 bilion federal loan.

Brightline West will cut travel times in half for the millions of people who want to travel from Southern California to Las Vegas, one of the world's top tourist destinations. The project will create $21 billion in economic value, $1 billion in tax revenue, and 35,000 construction jobs. It is a fully electric system, powered mainly by emissions-free energy. Brightline West will eliminate more than 325 million tons of CO2 annually.

Ridership is projected at between 9-11 million passengers annually, taking into account Brightline West's estimates of about 9 million one-way passengers per year and federal forecasts that range from 11 to 12 million passengers annually.

The train will travel from Las Vegas to Rancho Cucamonga in about 2 hours and 10 minutes, about half the driving time. Las Vegas to Victor Valley will be about 90 minutes, Victor Valley to Rancho Cucamonga about 35 minutes and Las Vegas to downtown Los Angeles (via Metrolink) is about 3 hours.

The rail line runs from the Las Vegas station and ends at the station in Rancho Cucamonga, where it connects with L.A. Metrolink to Union Station. There is a station planned for Victor Valley/Apple Valley, which connects with the High Desert Corridor and is the link to California High-Speed Rail in Palmdale. A station is also planned in Hesperia.